01
See the site properly
We take the time to understand the land, access and practical demands of the job.
Completed work
These are actual jobs completed by E O'Rourke LTD — driveways, roads and footpaths surfaced to a high standard. Every project starts with proper preparation and finishes with a surface built to last.
Featured project
Driveway, car park & concrete works — Loughrea, Co. Galway
Full driveway and car park surfacing in Loughrea — asphalt laid to a clean, durable finish across the full area. Concrete stairs, paths and kerbing completed alongside the tarmacadam surface. A complete job from groundworks through to the finished entrance.
Commercial project
Hospital car park resurfacing — Ballinasloe, Co. Galway
Large commercial tarmacadam contract at a hospital facility in Ballinasloe, Co. Galway. Full ground preparation carried out — excavation, sub-base work and compaction — before the Vögele paver was brought in to lay a smooth, durable asphalt finish across the entire car parking area. The contrast between the broken, uneven surface at the start and the clean result at the end shows the standard of work E O'Rourke LTD delivers on every commercial job.
Residential project
Yard & driveway renovation — Renmore, Co. Galway
Full yard and driveway renovation in Renmore, Galway — tarmacadam laid to a high standard throughout. Sub-base prepared, levels set and a clean, durable finish put down across the full area. The photos show the site back and front, the crew on the job and the completed result.
Residential project
Driveway & road resurfacing — Loughrea, Co. Galway
Full driveway renovation and road resurfacing in Loughrea, Co. Galway. The existing surface was stripped back, sub-base prepared and fresh tarmacadam laid to a clean finish. Road and footpath work carried out alongside the driveway — a complete surfacing job from start to finish.
Commercial project
Commercial tarmacadam — HSE facility
Large-scale commercial tarmacadam contract completed for the HSE. Full site clearance, ground preparation and sub-base work carried out before tarmacadam was laid across a large area. Safety management and site logistics handled throughout — a clean, professional finish delivered on a live facility.
The E O'Rourke approach
01
We take the time to understand the land, access and practical demands of the job.
02
The ground beneath the finish is shaped, compacted and readied with care.
03
We complete the work with a clean, durable result designed for daily use.
Bring us in early and we can help make the groundworks, drainage and finish work together from the start.